Load factor
From Wikipedia, the free encyclopedia
Load factor may refer to:
- Capacity factor, the ratio of the actual output of a power plant over a period of time and its output if it had operated a full capacity of that time period
- Load factor (aerodynamics), n, is the vector expressed by the ratio of the resulting mass force acting on an aircraft and the weight of the aircraft, n = (W + Fi) / | W | = (g + a) / g = 1 + a / g where W is the weight of the aircraft and Fi is the inertia force
- Load factor (transportation), the ratio of revenue passenger miles to available seat miles of a particular transportation operation (ie, a flight, a train, etc).
- Load factor (computer science), the ratio of the number of records to the number of addresses or indexes within a data structure, see hash table#Load_factor
- Load factor (electrical) is the average power divided by the peak power over a period of time, see demand factor
- Load factor (structural) is a number by which a specified load is multiplied to determine the required design load, see dead load, live load and structural design
| This disambiguation page lists articles associated with the same title. If an internal link led you here, you may wish to change the link to point directly to the intended article. |

